T/CCPA 56—2025 Information Management System Application Procedures for Production and Installation of Prestressed Concrete Cylinder Pipe
By:CCPA Standards    Date:2025/10/18

114.jpg




DESCRIPTION

This CCPA standard specifies the scope of information management for the production and installation of Prestressed Concrete Cylinder Pipe (PCCP), including the classification of information coding, the scope and methods of data collection, and the technical requirements for the information management system.

This CCPA standard is applicable to the development of information management systems and the implementation of information management for the production and installation of PCCP.

 



DOCUMENT DETAILS

This CCPA standard was drafted by CCPA.

Issue date: April 11, 2025

Implementation date: August 11, 2025

Pages: 30

Categories: Information Management System, PCCP

 



CONTENTS

1 General Provisions      

2 Terms

3 Basic Requirements

4 Information Classification and Coding

5 Information Collection and Application

6 Information Management System

7 Technical Requirements for Electronic Labels

8 Technical Requirements for Hand-held Terminals

Explanation of Wording 

Addition: Explanation of Provisions



Back to Top

X

您正在使用Internet Explorer浏览器


若您无法正常浏览本页面,为了得到我们网站最好的体验效果,请您更换为360、QQ、Chrome、火狐等其他浏览器.