T/CCPA 9—2019/ T/CBMF 64—2019 Technical Requirements for the No-autoclave Curing Production Process of Prestressed High Strength Concrete Pipe Pile
By:CCPA Standards    Date:2019/10/31

图片9.png




DESCRIPTION

This CCPA standard specifies the terms and definitions, the materials, concrete preparation and production requirement of PHC piles without autoclave curing process.

This CCPA standard is applicable to the production of PHC piles without autoclave curing process. 




DOCUMENT DETAILS

This CCPA standard was drafted by Jiaxing University College of CML Engineering and Architecture.

Issue date: July 12, 2019

Implementation date: October 31, 2019

Pages: 5

Categories: PHC Piles




CONTENTS

1 Scope

2 Normative References

3 Terms and Definitions

4 Materials

4.1 Cement

4.2 Fine Aggregates

4.3 Coarse Aggregates

4.4 Water Reducer

4.5 Mineral Admixtures

4.6 Water

5 Concrete Preparation 

5.1 Storage of Materials

5.2 Concrete Mix Design

5.3 Materials Measurement

5.4 Concrete Mixing

6 Production Requirement of PHC Piles

6.1 Concrete Placing

6.2 Curing

6.3 Concrete Strength Control





 

 










Back to Top

X

您正在使用Internet Explorer浏览器


若您无法正常浏览本页面,为了得到我们网站最好的体验效果,请您更换为360、QQ、Chrome、火狐等其他浏览器.